Mold testing department
Lorem ipsum dolor sit, consectetur amet adipiscing elit, sed do eiusmod tempor incidid unt ut labor et in dolore magna aliqua. Ultrices mi imperdiet tempus nulla malesua dan pellentesqu elit. Id velit ut tort do pretium viverra suspendisse nul potentim. Sol licitudin ac aliquam ultrices sagittis scelerisque orci a. Idoneno donec ultrices tincidunt arcuan nonen sodales neque sodales.
In the TRY-OUT department - thanks to the availability of presses with a capacity up to 2,000 tons - the tool is closed in press for the first time to verify interferences, gaps and contacts. This is a very delicate activity, leading up to the tool’s correct functioning. Once this phase has been successfully completed, try out starts, which will result in the production of the first sample part. Try-out and dimensional correction cycles start, where know how and technological means are put in place to achieve the product’s quality conformity. Intensive spotting, reverse engineering, dimensional compensation and milling loops take place up to meeting the prescribed tolerances.
Category:
Date:
December 13, 2023